Help /
Bill of Materials
Bill of Materials (BOM)
Define the components and quantities required to manufacture a product.
How to Create a BOM
- Select the manufactured Item (parent)
- Add component items:
- * Select Component Item
- * Enter Quantity required per unit of parent
- * Select Work Centre where this component is used
- * Optionally set Waste % for expected material loss
- Repeat for all components
- Click Update to save
Multi-Level BOMs
Components can themselves be manufactured items with their own BOMs. This creates a multi-level BOM structure. The system resolves the full material requirements during production planning.